

Partner with Qwathu Group Limited to handle budgeting, procurement, and site supervision. Get a smooth, well-managed building experience from foundation to completion.

Qwathu Group Limited has been engaged to facilitate the development of a filling station and retail shops on a plot located at Kabudula, Malawi. The proposed development comprises a filling station equipped with four (4) fuel pumps, alongside retail shop units, designed to serve the surrounding community and passing traffic along the area's road network. The project is being delivered as a full end-to-end engagement, beginning with the formalization of the land including site survey, sketch preparation, physical planning approval, mutation, cadastral survey, valuation, and title registration followed by the necessary regulatory approvals from relevant authorities, and culminating in the design, budgeting, and construction of the filling station and shops. Qwathu Group's role throughout is to manage this process on behalf of the client, ensuring efficient execution, transparent cost management, and regulatory compliance at every stage, from the initial site assessment through to a fully operational facility.
Location
Kabudula, Lilongwe
Start Date
September, 2026
Scope of Deployment


This is when our team was on-site at the Kabudula plot, walking the boundary and recording coordinate points to support the site sketch.

This is when our team was recording coordinates at the Kabudula plot, using GPS/GNSS equipment to capture boundary points for use in preparing the site sketch.

Qwathu Surveyors prepared a Site sketch of the Kabudula plot, showing boundary coordinates, bearings, and distances (A–N), a total area of 0.9878 ha (2.441 ac), plot location relative to the 24m and 6m road reserves, and an inset map indicating the plot's position within the surrounding area.