Finishing

The building has reached the finishing stage after progressing through site setting-out, foundation excavation, column base casting, backfilling, ground beam and slab casting, first-floor column works, two-storey superstructure walling, lintel and beam casting, roof structure installation and covering, and is now at the external plastering stage — with finishing works still ongoing on the remaining sections.